1994 Book of Rules
L1-OPS-PRO-001(12) Inner Group Operating Procedures
L1-OPS-PRO-002 (12) Clifton Hill Group Operating Procedures
L1-OPS-PRO-010 (15) Burnley Group Operating Procedures
L1-OPS-PRO-011(17) Caulfield Group Operating Procedures
L1-OPS-PRO-012(17) Northern Group Operating Procedures
Section 02 Fixed Signals – Rules 01-04
Section 02 Fixed Signals – Rules 05-14
Section 02 Fixed Signals – Rules 15-16
Section 02 Fixed Signals – Rules 17-23
Section 03 Detention at Fixed Signals
Section 04 Defective Fixed Signals
Section 05 Working of Points and Signals
Section 06 Supervision of Signallers and Signal Boxes
Section 07 Audible Track Warnings Signals
Section 08 Control and Working of Stations
Section 09 Working of Level Crossing
Section 13 Trains Stopped by Accident – Obstruction
Section 14 Single Line Working
Section 15 Infrastructure Works
Section 20 Double Line Block System
Section 26 Operating Procedures – Supervision of Signallers and Signal Boxes
Section 27 Operating Procedures – Working of Points and Signals
Section 28 Operating Procedures – Control and Working of Stations
Section 29 Operating Procedures – Working of Trains
Section 30 Operating Procedures – Infrastructure Works
Section 31 Operating Procedures – Train Control System
Section 32 Operating Procedures – Block Working Instructions
Section 33 Operating Procedures – Overhead and Electrical Equipment
Section 36 Regional Fast Rail Operations – Rev 17.01(SW.0042.2017)