1994 Book of Rules

L1-OPS-PRO-001(12) Inner Group Operating Procedures

L1-OPS-PRO-002 (12) Clifton Hill Group Operating Procedures

L1-OPS-PRO-010 (15) Burnley Group Operating Procedures

L1-OPS-PRO-011(17) Caulfield Group Operating Procedures

L1-OPS-PRO-012(17) Northern Group Operating Procedures

Section 01 General Rules

Section 02 Fixed Signals – Rules 01-04

Section 02 Fixed Signals – Rules 05-14

Section 02 Fixed Signals – Rules 15-16

Section 02 Fixed Signals – Rules 17-23

Section 03 Detention at Fixed Signals

Section 04 Defective Fixed Signals

Section 05 Working of Points and Signals

Section 06 Supervision of Signallers and Signal Boxes

Section 07 Audible Track Warnings Signals

Section 08 Control and Working of Stations 

Section 09 Working of Level Crossing

Section 10 Working of Trains

Section 11 Train Signals

Section 12 Shunting

Section 13 Trains Stopped by Accident – Obstruction

Section 14 Single Line Working

Section 15 Infrastructure Works

Section 20 Double Line Block System

Section 26 Operating Procedures – Supervision of Signallers and Signal Boxes

Section 27 Operating Procedures – Working of Points and Signals

Section 28 Operating Procedures – Control and Working of Stations

Section 29 Operating Procedures – Working of Trains

Section 30 Operating Procedures – Infrastructure Works

Section 31 Operating Procedures – Train Control System

Section 32 Operating Procedures – Block Working Instructions

Section 33 Operating Procedures – Overhead and Electrical Equipment

Section 36 Regional Fast Rail Operations – Rev 17.01(SW.0042.2017)

Back to top